DWG NO. SYM-SVC · REV A

Services

Each deliverable produced to a standard your reviewing engineer can sign off without a second pass — with the format and turnaround agreed upfront.

01 / CONTROL DESIGN

Control Design Diagrams

Control schematics and system architecture diagrams for air handling units, chillers, boilers, pumps and zone-level equipment. We map out sequence logic, input/output points and device relationships so the drawing reads clearly to both the reviewing engineer and the technician installing from it.

What's included

System schematics, control loop diagrams, equipment-level I/O mapping, legend and revision tracking.

Formats delivered

AutoCAD (DWG), PDF, and Revit/BIM on request.

Standards

ASHRAE guideline conventions, SMACNA references, and regional equivalents as required.

Typical turnaround

Confirmed per project scope at quoting stage — communicated before work starts, not after.

02 / FIELD WIRING

Terminal & Wiring Diagrams

Controller terminal layouts and field wiring diagrams mapped directly to manufacturer submittal sheets. Sensors, actuators, VFDs, dampers and panel terminations are labeled to match your points list exactly, so there's no translation gap between drawing and field.

What's included

Controller terminal maps, device wiring schematics, panel layout diagrams, terminal labeling matched to points list.

Formats delivered

AutoCAD (DWG), PDF.

Vendor-agnostic

Not tied to one manufacturer's toolset — so your project isn't limited by which controller platform you've standardized on.

Typical turnaround

Confirmed per project scope at quoting stage.

03 / SUBMITTALS

Technical Submittals

Complete submittal packages assembled the way your reviewing engineer expects to receive them — cut sheets, control narratives, sequence of operations, and drawing sets bundled and indexed as one reviewable document, not a loose folder of files.

What's included

Cover index, control narrative, sequence of operations, cut sheets, and drawing set — bundled for a single review pass.

Formats delivered

PDF (bundled), Word (editable narrative).

Review-ready

Structured to reduce reviewer back-and-forth — sectioned and indexed for fast approval.

Typical turnaround

Confirmed per project scope at quoting stage.

04 / POINTS DATA

Point Schedules

Full point schedules — object type, signal range, addressing and controller mapping — structured for direct import into your programming or commissioning software, not just for reading on paper.

What's included

Point name, object/signal type, range, controller and device address, cross-referenced to drawings.

Formats delivered

Excel, CSV, PDF.

Import-ready

Structured to drop directly into common programming and commissioning workflows with minimal reformatting.

Typical turnaround

Confirmed per project scope at quoting stage.

SHEET 05 — INDUSTRY VERTICALS

Sectors and building types we serve

Our drawings and submittals are engineered to the exact technical standards and regulatory requirements of each facility type.

SECTOR 01

IT & Commercial Real Estate

Office towers, tech campuses, and mixed-use commercial developments. Documentation includes VAV zoning, high-density occupancy DCV, tenant sub-metering, and enterprise BACnet/IP trunks.

Codes: ASHRAE 90.1 · Title 24 · BACnet IP
SECTOR 02

Mission Critical Data Centers

Colocation and hyperscale facilities where downtime is zero-tolerance. Submittals cover N+1 / 2N chiller sequencing, primary/secondary decouplers, CRAH controls, and differential static pressure grids.

Codes: ASHRAE TC 9.9 · Tier III/IV Redundancy
SECTOR 03

Pharma & Cleanrooms

Pharmaceutical manufacturing, biotechnology labs, and cleanroom suites. Precision schematics for cascade differential pressurization, HEPA monitoring, laminar hoods, and tight RH/temp envelopes.

Codes: cGMP · ISO 14644 · 21 CFR Part 11
SECTOR 04

Hospitals & Healthcare Facilities

Healthcare campuses and surgical centers. Complete submittals for negative-pressure isolation rooms (AIIR), operating theater pressurization, 100% outside air AHUs, and emergency generator failover sequences.

Codes: ASHRAE 170 · FGI Guidelines · NFPA 99
SECTOR 05

Central Utility Plants (CUP) & District Cooling

Central chiller plants, thermal energy storage (TES), condensing boilers, and district hydronic networks. Focus on hydraulic separators, primary/secondary VFD pumping, and plant optimization staging.

Codes: ASHRAE Guideline 36 · Hydraulic Decoupling

Not sure which deliverable your project needs?

Send us what you have — even a partial scope or a set of manufacturer submittals — and we'll tell you exactly what's needed.

Talk to us